马鞍山附近想过夜电话联系

Hello, welcome to visit the great wall construction machinery concrete mixing station equipment price network!

Online consultation | About us | contact us | Website map
Hotline: 0371-65861528


Current location: home page > News Center > What's new >

Equipment price of Great Wall mixing plant

Author: admin Time of issue: January 15, 2018 Number of visits:

Equipment price of Great Wall mixing plant The dust removal equipment on the top of the tank is characterized by novel technology, novel shape and optimized structure, with remarkable technical characteristics of "high efficiency, sealing, strength and rigidity". In order to further promote the development of concrete machinery industry in Chengdu, Great Wall college has been building a solid foundation for the development of concrete machinery industry, More for China's construction machinery industry to transport a large number of technical personnel. The common problems and solutions of drum mixer are introduced here, if you need to know more, please continue to pay attention to this website. Production orders and proportioning data are input and sent by professional departments to avoid repeated input and manual transmission, eliminate technical risks caused by manual transmission and manual operation errors, reduce the work intensity of mixing platform operators, make them more focused on production, and help to control product quality. Mechanical and electrical integration, automation and automation of production process. The stable soil mixing station is generally installed and arranged according to the engineering quantity, economic benefits and the actual situation of the construction site and surrounding environment. Due to the complex axial motion of the mixing machine, the mixing cylinder is driven by a variety of axial motion of the mixing machine, and the mixing cylinder is driven by the axial movement of the mixing cylinder and the mixing cylinder.

Great Wall mixing plant equipment price 26 large aggregate size (mm) 606080 water supply accuracy (%) ≤ 2% ≤ 2% ≤ 2% motor mixing motor 5. Settlement shrinkage crack 1. Preventive measures: (1) the cement dosage, water cement ratio and sand ratio of concrete should not be too large; the content of coarse aggregate should be increased to reduce the dry shrinkage; the mud content of sand and gravel should be strictly controlled to avoid the use of excessive silt; the concrete should be vibrated and compacted, and the slab surface should be plastered and pressed again after the initial setting and before the final setting, so as to improve the tensile strength of concrete and reduce the shrinkage. With its good water resistance, excellent plasticity, excellent fire resistance and competitive economy, concrete has become one of the most important engineering structural materials in the future decades and the foreseeable future. In order to improve the tensile strength and ductility of concrete, fiber can be added into concrete. Solutions: (1) the pumping construction should be based on the construction schedule, strengthen the organization and scheduling to ensure continuous and uniform feeding; (2) the pumping capacity of the concrete pump should be adapted to the concrete delivery capacity and the production and supply capacity of the mixing station; (3) when selecting the concrete pump, the large pumping equipment with strong pumping capacity should be selected first, so as to reduce the slump of the pumped concrete as much as possible; (4) coagulation The location of the earth pump should be close to the pouring point, and the pumping discharge port should be able to move.

Air entraining agent: it can introduce a large number of evenly distributed, stable and closed micro bubbles 5 in the process of mixing concrete. At the same time, many places in China are vigorously supporting the regular concrete mixing plant, which brings unprecedented opportunities to the whole industry. With the increasing demand for control, this control method is gradually eliminated. It is necessary to formulate reasonable construction technology and procedures for each project (there are one or more of the above conditions) and strictly abide by them; it is very important to maintain consistency, and it will cause trouble to break away from easily established specifications. Every expressway needs standardized management, and the management of concrete mixing station is similar. In order to facilitate people to walk on the highway, mixing station and reduce the incidence of accidents, it is necessary to complete these works efficiently. So how should we carry out maintenance and maintenance for such large equipment? 1. Check the wear condition and fixation condition of all steel wire ropes before starting the machine. If the concrete mixing plant is damaged, replace it in time. 2) Finished products into the car smoothly: concrete in a long period of time evenly into the car, no intermittent sudden unloading process. After the project is completed and put into operation, the annual sales revenue can reach 2. After removing the filter element of oil return filter, it was found that the filter element was seriously blocked. The filter element was replaced, the radiator was cleaned, and the port plate and liner plate of the plunger pump were replaced. Everything was restored to normal during the test run.