Site operation of great wall concrete mixing plant

Author: admin Release time: August 14, 2017 Number of visits:

Great wall concrete mixing plant installation site operation, yesterday we Great Wall Technology to the concrete mixing plant customer installation site to help installation and debugging, so, we briefly talk about how to install the concrete mixing plant, the installation of the feeding system will be finished material belt conveyor from the bend, put the back frame on its foundation, connect the front and rear frames, and then put the front and rear supports The legs shall be connected with the conveyor, and the diagonal brace shall be connected with the lifting lug on the rack. Then, the front of the conveyor shall be lifted, and the front and rear legs and diagonal braces shall be connected, and the anchor bolts of the front and rear legs shall be tightened. During the hoisting of mixing machine, the installation of mixing machine and powder batching system shall be carried out. The main frame shall be lifted and placed on its foundation, and the anchor bolts shall be fastened.
For the installation of finished product storage hopper, lift the finished product storage hopper, erect the legs, and connect the walking platform and ladder with the finished product storage hopper. The installation of the granular material batching system is based on the hoisting of the granular material batching system. The inserting plates are connected well. The heightening plates on both sides are folded and connected with the inserting plates. Then, the original aggregate conveyor is expanded to connect the front and rear frames, so that the electric drum is aligned with the center of the cover hole of the mixer head, and the anchor bolts are tightened later. For the installation of great wall cement silo, all parts of the cement silo are assembled one by one on the ground, the cement silo is lifted, and the side of the lower bin body with less transverse bracing is facing the powder proportioning system, and the upper and lower silos are fixed, and the anchor bolts are fixed.
The installation of great wall screw conveyor suspends the screw conveyor, connects the ball joint of screw conveyor with the discharge port of cement bin, makes the discharge port align with the feeding port of powder hopper, and then connect the conveyor with the lifting lug of cement bin with steel wire rope, and then fix the anchor bolt.
Later, what we need to add to the Great Wall is to lift the water pump and put it in a proper position and connect the water outlet pipe. Put the air compressor on one side of the finished product hopper, connect the outlet of the air compressor with the inlet of the air control box with the air pipe, and connect the air pipe leading the outlet of the air control box to the broken arch of the cement silo. If there is anything unclear or unclear, you can consult our concrete mixing plant manufacturer at any time.