马鞍山附近想过夜电话联系

Hello, welcome to visit the great wall construction machinery concrete mixing station equipment price network!

Online consultation | About us | contact us | Website map
Hotline: 0371-65861528


Current location: home page > News Center > Special report >

Performance of ready mixed concrete plant

Author: admin Release time: November 8, 2016 Number of visits:

1: Environmental protection performance of commercial concrete mixing station:
1) All powdery materials, from feeding, batching, metering, feeding to mixing and discharging, are carried out in a closed state.

2) The dust discharge pipes of mixer cover, cement metering bin and fly ash metering bin are all connected with the dust remover, and the aggregate filling port is provided with dust suppression plate, so as to reduce the dust emission.

3) The fully enclosed mixing main building and belt conveyor structure greatly reduce the environmental pollution caused by dust and noise.

4) Negative pressure dust removal and special fiber filter cloth are used to make the dust generated during feeding enter into the dust collector of cement bin without diffusion to the surrounding area. The collected dust can be easily recycled and reused, and effectively protect the environment.
2: Reliable performance of height of commercial concrete mixing station:
1) The high chromium and manganese alloy wear-resistant material used in the mixing blade and the multiple seals used in the shaft end support and sealing form greatly improve the reliability of the main engine.

2) The wear-resistant steel plate is used to reinforce the vulnerable parts.

3) The service life of the ring belt joint is 3 times longer than that of ordinary steel riveting.
3: The good mixing performance of commercial concrete mixing station is as follows
1) The maintenance and repair part of the whole set of equipment is equipped with platform or maintenance ladder, which is convenient for inspection and maintenance operation. The main engine cleaning is equipped with two sets of devices: Pump flushing and manual operation.

2) Platform building structure and aggregate belt conveyor fully enclosed structure, to ensure that all operations can be carried out without hindrance.

3) A closed belt conveyor with overflow outlet at the lower part can effectively prevent sand and gravel from scattering everywhere. The belt conveyor adopts the structure of heavy vertical tension, which avoids the adjustment in the production process.
4: Excellent control and operation system of commercial concrete mixing station:
1) The whole machine is controlled by computer, which can be controlled automatically or manually, and the operation is simple and convenient.

2) The dynamic panel can display the operation of the components of the mixing plant (building), store various data of the mixing plant (building), print various report materials according to the requirements, and store more than 30000 formulas.

3) The control room is spacious and bright, beautiful and generous, and equipped with air conditioning, which can ensure the electrical components to be durable, stable and reliable.

4) The control system adopts the unique dual control form of the state office. The data is shared between the control computer and the management computer. When the control computer fails, it can be switched to the management machine to ensure the continuous normal operation of the system.

5) Monitoring cameras can be set in the main machine discharge port, batching station and other key components.

Zhengzhou Great Wall Construction Machinery Manufacturing Co., Ltd