马鞍山附近想过夜电话联系

Hello, welcome to visit the great wall construction machinery concrete mixing station equipment price network!

Online consultation | About us | contact us | Website map
Hotline: 0371-65861528


Current location: home page > News Center > Special report >

What can be done with the concrete leaked from the mixing plant

Author: admin Release time: December 22, 2017 Number of visits:

What can be done in the concrete mixing station Generally, the more manpower is consumed, the machinery is relatively cheaper. Great wall construction machinery will continue to practice the goal of powerful equipment, uphold quality as the letter, implement the requirements of "quality engineering" activities, and comprehensively promote the two-way improvement of product quality and management quality for all products in accordance with the work requirements of "three excellences and three specialties" (namely lean design, lean manufacturing, fine management, dedicated service, special customization, and specialized training), so as to comprehensively promote the two-way improvement of product quality and management quality for customers We should do a good job in "lean service", improve the quality of equipment in kind, and interpret the concept of "intimate, whole life cycle," and "wholehearted" service of great wall construction machinery with actions. Therefore, the production efficiency of the mixing station can be improved mainly from two aspects: the production efficiency of the mixing station and the production efficiency. How to choose the right load cell? There are two types of weighing sensors: Great Wall and tension. The control system of concrete mixing station mainly collects the weight signals of various materials, so the Great Wall sensor is selected. This sentence has also become the mantra of every member of the team. Therefore, the logistics room delivery center team has not had any safety accidents since its establishment for several years. ④ Adjust the dial switch of the signal transmitter, adjust the signal amplification multiple through the combination of different dial codes, and then adjust the output voltage AV + / - (the range of AV voltage value is 0-10) through the zero potentiometer. 5) To. 0。 ③ The setting of unit electric quantity equivalent to load is discussed.

What can be done for the concrete leaked from the mixing plant? Environmental protection mixing plant adopts uniform sand and gravel blanking system to reduce motor power and noise; low noise motor system is used in the whole station to reduce the impact of noise on the environment. Vibration pads are arranged at the connection parts of vibration equipment and other equipment to reduce vibration noise. Entering the production workshop of great wall construction machinery, Mr. Wang introduced the company's flagship product HZS180 concrete mixing station to President Li and his party. After listening to Mr. Wang's brief introduction of the company's concrete mixing plant equipment, President Li fully affirmed the product quality and achievements made in recent years. The popularization and application of commercial concrete relies on scientific and technological production to realize the industrial reform of the construction industry, meets the needs of the modern city great wall, purifies the urban environment, and has remarkable social and environmental benefits. The gear and bearing of the concrete mixer reducer splash the oil to the inner wall of the box by rotating the gear, and then flows into the bearing for lubrication. Great wall construction machinery to answer this, for your reference.

What can be done for the concrete leaked from the mixing plant? Add lubricating oil to each lubricating point. The liquid weighing system of the liquid weighing concrete mixing station includes the weighing of water and liquid additives, including the liquid delivery pump, liquid delivery pipeline, weighing bucket and butterfly valve, and also includes the weighing bucket bracket and the weighing bucket holding device. The weighing bucket bracket is arranged around the weighing bucket, and one end of the anti swing device is connected with the weighing bucket, and the other end is connected with the weighing bucket bracket for holding down the scale The swing range of the measuring bucket. JS series concrete mixer is a kind of high efficiency forced concrete mixing machine. It can not only work alone, but also be used in mixing station. No matter what purpose it is, the following matters should be paid attention to in operation: 1. At the same time, the ash accumulation outside the mixing drum should be cleaned to keep the machinery clean and intact. Before operating JS series concrete mixer, the staff should be familiar with the above operation steps, and be orderly in the actual operation process, so that the mixer can be put into production efficiently. When the admixture is transported to the construction site (or concrete mixing station), representative samples shall be taken for inspection immediately, and the purchased products shall be consistent with the trial mix of the project before they can be put into storage and used. When the concrete is pumped by piston, there should be enough concrete in the receiving hopper of the pump, and no air should be inhaled; (10) when the concrete starts to pump, it should be kept at a slow speed to observe the pump pressure (not more than 20n / mm2) and the conditions of various parts, and then pump at a constant speed after confirming the normal operation; (11) it is necessary to maintain the continuous pumping of concrete by reducing the pumping speed if necessary Continuation. Check the legal measurement management signs, explanatory signs, verification marks and safety measures, power on self inspection procedures, use conditions and uses of the batching scale, and observe whether the scale body of the batching scale is in a stable state, whether there is abnormal contact under the scale body, and whether the windproof equipment around the scale body is in contact with the charging hopper. The water supply device should be kept clean to avoid blockage. The suction valve should be checked and cleaned once. Pouring concrete in hot weather is not a rare process, but also a special process; it needs to adopt some specific measures to control the influence of high ambient temperature, high concrete temperature, the first relative humidity, high wind speed and high solar radiation.