Investment and construction of concrete mixing plant equipment is a work with large amount of work and long operation time, which requires our operators to have certain professional quality. After a series of investigation and comparison work, we will complete the procurement work of our initial mixing station. So, after we purchase a set of concrete mixing plant equipment, how should we install it? How to install it to make our mixing plant more efficient? First of all, we should pay attention in the initial site selection, to take all the convenience into account, better choose our mixing plant as close as possible to the gravel plant, water and power resources should be sufficient, mainly away from residential areas. If the station is built on the hillside terrain, we can consider making full use of the terrain conditions and setting the stockyard on the higher ground of the hillside, which can save energy and reduce the wear degree of the loader in the mixing station.
In addition, during the installation of large-scale concrete mixing plant equipment, attention should be paid to avoid ground and underground optical cables, power supply or communication cables, and the help of local competent authorities should be sought when necessary, so as to avoid unnecessary losses caused by improper operation. Secondly, the equipment specification, concrete mixing plant equipment configuration has strict specifications and requirements. The first is the aggregate supply mode, which is better to use the loader for feeding, and then the proportioned aggregate is transported to the mixer through the belt conveyor. After that, it is the batching of concrete mixing station equipment. The aggregate scale of a complete concrete mixing station is 1 scale in cumulative measurement and 2-4 scales in separate measurement. In order to ensure the weighing accuracy and mixing quality, the more important control system of large-scale concrete mixing station is to adopt double microcomputer automatic control system. In addition to strong reliability, it can also dynamically and synchronously display the working process of concrete mixing station equipment. At the same time, the control system of the mixing station should also have the functions of out of tolerance alarm, fault diagnosis and solution, and emergency stop of inclined belt.
Later, that is, the installation specifications we mentioned today, we should design the foundation drawing according to different engineering conditions of users, and then make the foundation according to the designed foundation, and embed the embedded iron. The construction drawings of the station must be determined before the construction of the station. If the customer purchased the mixing plant equipment in our great wall, we will sign the order contract in the early stage We have already planned the foundation map. If we buy it from other manufacturers and do not have the foundation map provided to us, we should pay attention to how to plan the site and find a professional to guide us. This can not be ignored. The specific installation steps are as follows:
1. Draw lines on the civil structure according to the general layout plan;
2. After all kinds of mechanical equipment are installed in place, then the chute between the equipment is made, and then the water and electricity pipeline installation and pipeline layout are carried out;
3. Carry out commissioning and acceptance according to relevant standards and acceptance specifications;
4. After installation and commissioning, the equipment of concrete mixing station shall be appraised by local technical department, and it shall be appraised once every six months after putting into use.
Zhengzhou Great Wall to provide customers with various types of concrete mixing plant equipment, if you have mixing plant equipment problems, welcome to call: 15188355510, we will provide you with 24-hour help!