Precautions for equipment maintenance of mixing plant

Author: admin Release time: September 12, 2017 Number of visits:

In order to ensure the normal operation of the concrete mixing station, it is necessary to check the concrete mixing station every day. So, what are the daily inspection work of concrete mixing station? Or how to use it, the great wall here to introduce several must pay attention to the place, please the majority of concrete mixing station customers attention!
1. Check the working condition of the smooth points of each rotating part every day and replenish the smooth oil in time.
2. Check the amount of smooth oil in the smooth oil cup of the mixer every day and replenish the smooth oil in time.
3. Check the oil level height of the oil atomizer on the gas system once a week, and use smooth oil with viscosity of 2.5 ~ 7 ° E.
4. Turn on the drain valve once a day before starting and after shutting down to discharge the condensed water from the air compressor and air storage tank.
5. Fasteners (such as bolts and nuts) should be checked weekly to see if they are loose. If any, it is necessary to tighten them in time, especially some parts subject to variable amplitude load.
6. Check whether the equipment of water supply, gas supply and admixture system is normal every day.
7. Check whether the electrical control system and appearance are normal every day.
8. Check whether the mixing shaft and all parts of the mixer are clean every day. If there is too much concrete on the mixing shaft, it is necessary to clean it manually.
9. Clean or replace the filter screen in the dust collector of the powder tank every six months.
10. If the shutdown time is more than one week, it is necessary to empty the materials in each metering hopper, and clean the mixing machine, discharge hopper and other places to avoid material hardening.
11. Each shift should check whether the sealing cavity and pipeline at the shaft end are smooth and full of grease, and whether there is enough lubricating oil (grease) at each lubricating point and reducer box.
12. Each shift shall observe whether the grease in the oil tank of the electric lubricating pump is used up, and it is not allowed to run without oil.
13. The accumulated materials inside and outside the mixing drum and the discharge door must be completely cleaned up after the shift of each shift, and washed with water. The unclean adhesive materials should be chiseled off regularly.
14. Keep in mind that the mixing blades must be adjusted and tightened once a week to prevent accidents caused by blade falling off. Pay attention to the above points, customers can basically use the concrete mixing station of our factory!