In order to strengthen the equipment management of the mixing plant, ensure the production quality and timely delivery to the user, the following emergency treatment plan is specially made for the mixing station in combination with the emergencies in the process of production and transportation.

1. Before opening, the maintenance driver, repairman, electrician and mixer operator shall inspect the mixing plant equipment and transport vehicles, and the production can be carried out under the normal conditions of the equipment and transport vehicles.

2. In order to prevent power failure in the production process of the mixing plant, a set of more than 0kw internal combustion generator and full-time generator driver are prepared. In case of power failure, the power generation emergency is immediately generated. The driver of the generator often lives in the mixing station and is ready to order. The station master and the dispatcher direct the deployment.

3. In the process of transportation, if the vehicle fails to unload materials due to mechanical failure, it shall be repaired in time. If it cannot be repaired within the specified time, the concrete of the vehicle shall be scrapped; if the road is blocked, dredging or detour operation shall be adopted.

4. In case of equipment failure in the mixing plant during the production process, repair shall be carried out immediately. The members of the repair team are repairmen, electricians and maintenance drivers. At the same time, another concrete mixer shall be started immediately to ensure the continuous concrete pouring.