马鞍山附近想过夜电话联系

Hello, welcome to visit the great wall construction machinery concrete mixing station equipment price network!

Online consultation | About us | contact us | Website map
Hotline: 0371-65861528


Current location: home page > News Center > Technical articles >

Concrete mixer truck

Author: admin Release time: November 10, 2016 Number of visits:

The construction waste mixer of concrete mixer truck is a better equipment for the treatment of construction waste. For many years, great wall construction machinery machinery has been focusing on the development of mobile mixing station. The concrete mixing station is an equipment with the advantages of energy saving, environmental protection and low carbon. Waste wood can be used to make adult wood. According to our experience, the construction waste in a city is generally piled up in one place for centralized treatment, and there is no need for treatment equipment to carry out construction waste treatment everywhere. The mobile screening station is mainly composed of vehicle mounted feeder and vibrating screen, the motor and control box are installed together, and the corresponding traction steering shaft is configured to facilitate highway transportation. At the same time, the screen can be adjusted arbitrarily according to the production needs to meet the requirements of various aggregate gradation. 1.10 centralized oil supply system (some models) is adopted for lubrication. The supporting plate is welded with steel plate, and the lining plate is made of high manganese steel casting. After assembly, it is installed on the body of concrete mixing station of great wall construction machinery with two axle stands. Hammer concrete mixing station although there are many points, but we all know that anything is not, and hammer concrete mixing station also has its disadvantages, because. Hammer concrete mixing station in the use of the process will have grate plate damage phenomenon, then how do we solve it? Today, I would like to introduce some maintenance methods of hammer concrete mixing station. The damage of the grate plate is mainly manifested in the fracture of the grid frame and the bending or breaking of the grate. The main reason is that the reinforcement plate of the hammer type concrete mixing station protrudes too high and the strength is not enough. When a metal block enters the hammer concrete mixing station, it collides with the hammer head, resulting in the damage of the grate plate.

When the concrete mixer truck is mixing materials, the materials pass through the roller wheel from the feeding port and are mixed after rolling. The finished products after mixing are discharged from the bottom frame. Trouble shooting of hammer concrete mixing station. 1. The bearing is overheated. The grease is too dirty; the grease is not enough. One of the main customers of vibrating screen manufacturers is coal enterprises. They have a large demand for vibrating screen, coal feeder and other equipment. For mining, coal and metallurgical enterprises, if such a sudden stop for repair one day, the direct production benefit loss will be less than tens of thousands, more than hundreds of thousands or even millions of yuan. 4. Transformation of centralized lubrication system of coal gangue mixer, grease nozzle is equipped with centralized oil distribution pump, and multi-channel oil supply is provided in one step. The factors affecting the screening process of vibrating screening equipment can be roughly divided into three categories: first, the influence of screen surface properties and structural parameters. The working principle of vibrating screen is that particles and screen surface move vertically, so the screening efficiency is high and the production capacity is large. Generally, the aspect ratio is 2. The waviness of raceway, especially the surface of rolling element, has great influence on the vibration of bearing. The clearance and relative movement of rolling surface between rolling element and cage, inner and outer ring will cause bearing vibration. This is due to the high spin frequency of rolling element, working surface contacting with inner and outer raceway at the same time, the vibration produced by rolling element, ring and cage is about 4:3:1. At the end of last month, the Group signed an integration agreement with Jindi mining company of Dawan mining area in Laiyuan County. By the end of the year, Hebei Iron and Steel Group will complete the integration of Dawan molybdenum resources. Such as: construction waste treatment equipment, construction waste recycling equipment, energy-saving concrete mixing station, fine sand recycling machine and other energy-saving and environmental protection mining equipment, in order to ensure the increase of production capacity, but also take into account to reduce energy consumption to a lower level. According to the "Hefei city basic great wall construction machinery project charge management measures", the municipal government service center set up the basic great wall construction machinery project charge joint window, involving the basic great wall construction machinery project charge of administrative institutions, government funds, as well as the operating service fees collected by the departments and must be paid as the relevant administrative license In addition, it is necessary to apply for the construction permit in three stages, i.e. to apply for the construction permit in three stages, and to handle the construction permit in three stages. The loader directly dumps the materials full of reinforced concrete and bricks into the mixing station. The concrete mixing station eats the materials in a big way without the great wall construction machinery. After a series of processes such as mixing and separation in the concrete mixing station, the recycled aggregate and reinforcement are discharged from the discharge port and flow into the belt conveyor, which is sent to the screening machine by the belt conveyor, and placed on the iron remover of great wall construction machine above the No.1 belt conveyor After all the reinforcement is recycled, the aggregate is sent to the vibrating screening machine, and 3-4 kinds of recycled aggregate are screened out by the screening machine, and then sent to the material pile by different belt conveyors. Seeing the high-efficiency mixing and screening process of the huge object in the mixing station, the audience picked up their cameras to take pictures. According to the introduction, the plant can not only reduce the cost of two million tons of limestone per year, but also reduce the construction cost of hundreds of thousands of people.

SMA Pavement of concrete mixer truck has good durability, so it has less maintenance work, long service life and good comprehensive economic and environmental benefits. For the Great Wall Road construction machinery, it is very important to select the appropriate concrete mixing plant and sand and gravel production line.