马鞍山附近想过夜电话联系

Hello, welcome to visit the great wall construction machinery concrete mixing station equipment price network!

Online consultation | About us | contact us | Website map
Hotline: 0371-65861528


Current location: home page > News Center > Technical articles >

Model of cement mixer

Author: admin Release time: December 7, 2017 Number of visits:

Zhengzhou Changcheng Construction Machinery Co., Ltd., a national innovative enterprise and high-tech enterprise driven by innovation, is moving towards the blue ocean with the new business model of "core manufacturing + complete service". At the evening party, a customer said that the staff of Great Wall Construction Machinery Co., Ltd. had a paranoid attitude towards service. No matter what difficulties they encountered, great wall construction machinery always paid attention to the interests of customers, and provided superior products and unparalleled services as always, which provided us with service guarantee for the whole life cycle and construction process of products, and completely solved our worries in the future. The powder bin is used to store cement, fly ash and other powder materials. It is composed of bin body, legs, ash inlet pipe, dust remover, safety valve, arch breaking device, material level meter and ladder. The powder bin is equipped with bag vibration dust remover to avoid dust pollution. It is reported that this "pure accessories, choice of value" accessory promotion activity is a large-scale promotion activity of Great Wall Construction Machinery Co., Ltd. in terms of spare parts sales, the activity mainly focuses on profit concession and discount. Alignment and grouting (1) alignment method: adjust the center line of the equipment with the center line of the equipment foundation, and adjust the elevation with the pad iron. (2) the installation dimension deviation meets the following requirements: ① the allowable straightness deviation of the center axis of the casing: when the length of the spiral body is ≤ 15m, the allowable deviation is ≤ 4mm. After the test run and installation is completed and the inspection is qualified, the test run shall be carried out according to the following steps: (1) add lubricating oil according to the requirements of the manual. Zhengzhou Great Wall Construction Machinery Co., Ltd. is specialized in producing concrete mixing equipment for more than 30 years, with reliable quality and technology. Welcome to inquire and purchase.

Before starting the cement mixer model, check whether the mixing direction and the direction of the discharge device are consistent with the mark, otherwise, it can not work, so as to damage the machine (Note: if the steering is wrong, the two joints in the three-phase line should be replaced to ensure the correctness). However, the suspension time shall not exceed 15 minutes. During the suspension period, two strokes of reverse pump and positive pump operation shall be conducted every 3-5 minutes to prevent concrete deposition from blocking the pipe. Preventive measures: 1) avoid excessive vibration of concrete, prevent the formation of mortar layer on the surface, and strengthen the maintenance to improve the surface temperature.

Model of cement mixer (2) avoid producing thin prefabricated components directly on deep soft soil or fill; or use it as prefabrication site after compaction and reinforcement. Weighing test. Check whether the connecting bolts of blade and support arm of concrete mixer are loose, and adjust as appropriate. The gap between blade and cylinder wall is larger, and the gap is 5mm, and make necessary tightening. 4. Different requirements of concrete batching machine, concrete mixing machine, concrete batching machine, concrete batching machine, concrete batching machine, concrete batching machine, concrete batching machine, concrete batching machine, concrete batching machine, concrete batching machine, concrete batching machine, concrete batching machine, concrete batching machine, concrete batching machine, concrete batching machine, concrete batching machine, concrete batching machine, concrete batching machine, concrete batching machine, concrete batching machine, concrete batching machine, concrete mixer. Zhengzhou Great Wall Construction Machinery Co., Ltd. teaches users how to strengthen the daily maintenance of concrete mixing station to extend the service life of mixing station. At the same time, increasing the unloading angle of aggregate storage bin can alleviate the problem of high mud content and high water content of sand in rainy days. The mixing tank is inlaid with a wear-resistant lining plate, which is connected with the tank body by countersunk screws. The lining plate of the column part is called the arc lining plate, and the lining plate of the end face part is called the side lining plate. In addition to the measures, the setting of mixing station shall also comply with the provisions of relevant national mandatory standards. Compared with foreign equipment, it is not worthless. For example, the design idea is more flexible and can be customized according to the different needs of customers; with the advantage of geographical environment, we can understand the problems of equipment in actual production through various channels, establish a complete and excellent after-sales service system, and solve the problems in time according to the requirements of customers, The manufacturing and debugging cycle of the equipment is shorter than that of foreign countries, and the cost is cheap and the maintenance is convenient. A user found that in the process of using the concrete mixer truck, whether the concrete tank is in forward or reverse rotation, it needs to turn the engine throttle to a large value before turning slowly. Once the accelerator is turned down, it will stop turning immediately. In our concrete production enterprises, the main place where the sewage in the concrete mixing station appears is our mixing station car washing part, main station part and our sand and gravel recovery system. He was rescued by police and civilians. Several migrant workers called 120.