马鞍山附近想过夜电话联系

Hello, welcome to visit the great wall construction machinery concrete mixing station equipment price network!

Online consultation | About us | contact us | Website map
Hotline: 0371-65861528


Current location: home page > News Center > Technical articles >

Stabilizing the price of Xuzhou beilian soil mixing equipment

Author: admin Release time: December 7, 2017 Number of visits:

To stabilize the price of Xuzhou beilian soil mixing equipment, the third is to implement differentiated management for maintenance stations, and to gradually realize regionalization of service, mechanization of service and sharing of service resources. The practice of great wall building machinery is to complete a huge system engineering, that is, the design of production line before the robot really takes up the post. About HZS90 concrete mixing plant equipment you still need to know, you can call the official website hotline for free consultation, professional customer service personnel will provide you with detailed guidance and answers. It is reported that this "pure accessories, choice of value" accessory promotion activity is a large-scale promotion activity of Great Wall Construction Machinery Co., Ltd. in terms of spare parts sales, the activity mainly focuses on profit concession and discount. ⑦ If the weight value of the scale fluctuates up and down, it is necessary to check whether the grounding is reliable; if the input voltage of the transmitter is normal while the output voltage of the transmitter is abnormal in the process of scale calibration or use, it can be judged that the transmitter is faulty, and the transmitter should be replaced for treatment. There are also chain bucket elevator and vertical lifting screw conveyor. The former is rarely used in the concrete mixing plant which is often relocated, which mainly aims at bagged cement. In 2003, the Ministry of Commerce, the Ministry of public security, the Ministry of the great wall and the Ministry of Communications issued the notice on prohibiting on-site mixing of concrete in urban areas within a time limit, which identified 124 cities that prohibited on-site mixing. The introduction of commercial concrete mixing stations greatly promoted the use of ready mixed concrete by units of the great wall and construction units, and responded to the call of national policies This is one of the uses of commercial mixing plant.

Xuzhou beilian price charging system of stabilized soil mixing equipment is used in concrete mixer with high frequency and high working intensity, and it is easy to wear and tear. Users should pay attention to the maintenance work in the process of daily use. The specific methods are as follows: 1. ② Remove the concrete adhered to the pump body. The HZS series concrete mixing station produced by Zhengzhou great wall construction machinery is mature in technology and complete in types. Welcome to inquire and purchase. As the main person in charge of the mixing plant management, responsible for the safety production, staff health, environmental protection, product quality and cost accounting of the mixing plant; 3. At the pump outlet, it is better to connect the horizontal straight pipe of more than 3 meters first, and then connect the elbow pipe to reduce the pumping resistance. And in many cases, the evaporation rate of fresh concrete increases. According to ACI 5r-91, the probability of plastic cracking under the combined action of the following temperature and relative humidity is basically the same; the wind speed exceeds 4. The HZS concrete mixing plant produced by Zhengzhou Changcheng Construction Machinery Co., Ltd. is divided into engineering concrete mixing station (small mixing station) and commercial concrete mixing station (large mixing station). Both of them are concrete production equipment, but there are some differences in configuration. We know that any product has its own loss, and overload production is to shorten the service life of the product, so is the concrete mixing plant. Among the various HZS concrete mixing plants we produce, we can make the products meet the standards when they leave the factory, but the use after that needs the maintenance of the products by the users. Next, we focus on the HZS series mixing plant Details of daily maintenance of mixing station: 1. In the installation process of HZS type concrete mixing station, it is not allowed to let the cement bin incline, because in the process of our use, it will lead to uneven stress on each leg of the cement silo, leading to collapse, affecting the future use. After ordering the concrete mixing station, the customer needs us to measure on site, how to arrange the placement of the mixing station, the foundation design drawings are all responsible for the mapping, design and drawing by the manufacturer. We will have a detailed understanding of the following: 1. The level of the concrete mixing station foundation must be detected by the level gauge and the ultra leveling instrument, and the loss caused by the uneven foundation is not responsible. Powerful function and high stability.

The user should check all the installation equipment and installation tools, check whether these equipment and tools are complete, whether there are potential safety hazards, and then carry out the installation procedure; when installing, pay more attention to safety, every employee must wear the safety tools that should be equipped, no matter any equipment of the concrete mixing station should be hoisted There is no one nearby, especially below, when hoisting, there must be a professional command; the installation can be assured after the above safety measures are paid attention to; the installation is to randomly check the installation size and correct the deviation; during the installation, the waist connection of any equipment in the concrete mixing station is firmly connected after the hoisting, and careful inspection is conducted after the connection is completed; the flange connection surface and water unloading are carried out during the installation The flange connection surface of the pipeline should be coated with sealing objects; when installing the weighing hopper, the safety of the sensor must be ensured; when installing the air cap and air valve, check it first, and the rubber pipe joints should not leak; when installing, every equipment in the concrete mixing plant should avoid collision as far as possible, and the bolts, nuts and welding places must be firm. Maintenance of the air compressor, the oil level in the oil tank of the air compressor should be above the lower oil level mark line. Check the oil level and the quality of lubricating oil every half a month or regularly, and add or replace it if necessary; use No.19 compressor oil in summer and No.13 compressor oil in winter. Specification for concrete repair mixer 1. Air system: the oil level of the air pump crankcase is within the range indicated by the oil tank. Each air valve cylinder should act sensitively. There should be no air leakage at the effective pipelines and interfaces. The damaged parts should be repaired in time. The water in the oil-water separator and air storage tank should be drained every day. The oil atomizer should have enough oil.