Maintenance manual for JS mixer of concrete mixing station

Author: admin Release time: September 14, 2017 Number of visits:

The concrete mixer plays an important role in the maintenance of concrete mixing station. The normal operation of the mixer affects the working efficiency of the whole mixing station and the quality of commercial concrete, so the daily maintenance of the concrete mixer is particularly important. As a manufacturer for more than 20 years, Great Wall briefly introduces the maintenance manual for the main engine of concrete mixing station. The following is for your reference only:
1、 Mixing system: whether the mixing blade, door side plate, lining plate and mixing arm are missing and damaged. Whether there is residual material in the mixer, if necessary, clean it in time, and repair or replace the damaged parts in time;
2、 Whether the oil level of the air pump crankcase of the air pump in the mixing station is within the range indicated by the oil window, whether the air valves and cylinders respond sensitively, the effective pipelines and interfaces shall not leak, and the damaged parts shall be repaired or replaced with new parts in time. The water in the oil-water separator and air storage tank should be drained every day. The oil atomizer should ensure that there is enough oil. If the oil is insufficient, it should be added in time and checked frequently.
3、 The water supply valve of the waterway system should be opened and closed well to ensure the normal and smooth waterway. The water slag should be cleaned up in time. If there is any fault, it should be removed in time.
4、 Lubrication system: the shaft head seal is fully filled with grease for each nozzle. Check the oil surface height of each box and add sufficient grease.
5、 Transmission system: it is necessary to check whether the tension of V-belt, chain tightness, coupling interval, conveyor belt is normal, whether the belt has worn or damaged parts, and repair them in time;
6、 Whether the sensor, linkage rod and sensor are normal, and whether the metering system is accurate. Adjust the metering transmission rod in time to avoid measurement error.
7、 The foot screw, double head adjusting screw, solid bolt shall not be loose, and the operation room shall be kept clean and the platform inside and outside the mixer and the stair floor shall be cleaned. The maintenance of concrete mixing machinery has a long way to go. It is a tedious and repeated work, which requires professional and careful maintenance personnel. If there is any problem that can not be solved in the operation, it is necessary to contact the technical personnel of the manufacturer in time. If the equipment can be well maintained, it will bring unimaginable effect to the later equipment operation and service life.